• Track Record

    Leading Trenchless Technology & Pipe Jacking Specialist in Hong Kong

    Delivering High-Precision TBM Tunnelling & Underground Infrastructure Projects

    10+ Years
    Trenchless Infrastructure Expertise in HK & Asia
    100%
    Project Delivery for Gov & Public Utilities
    0.15m - 3.7m
    Full-Range Boring Capability (Pipe Jacking & TBM)

    Featured Pipe Jacking & Trenchless Projects

    Water Main Laying Works at South Lantau Road

    Dec 2023 - Ongoing TBM Tunnelling / Trenchless Method
    Contract No.: 18/WSD/21
    Main Contractor: Water Supplies Department (WSD) | CRBC - Chun Wo JV
    Specifications: Utilizing advanced trenchless pipe jacking technology to install a giant 1800mm diameter sleeve pipe, spanning a total length of 568m.

    Sewerage Works & Connection at Tai Po Tsai Village

    Oct 2022 - Jun 2023 Pipe Jacking Method / Pipeline Rehabilitation
    Contract No.: WSD DC/2019/09
    Main Contractor: Drainage Services Department (DSD) | China Geo-Engineering Corp
    Specifications: Successfully deployed microtunnelling pipe jacking method to bore a 1200mm diameter outer casing, precision-installing a 355mm sewer pipeline for a length of 60m.

    Track Record: Milestone Trenchless & Tunnelling Projects

    2023 - 2024

    Upgrading of Sheung Wong Yi Au Fresh Water Pumping Station

    Client: WSD (Contract No: 2/WSD/19/SC/18)
    MethodSegmental Hand Shield Tunnelling
    SpecificationsTotal Length: 57m
    2022

    Kai Tak Sports Park Sewerage Network Infrastructure Project

    Client: Civil Engineering and Development Department (CEDD)
    MethodTrenchless Pipe Jacking Method
    Specifications1200mm Dia. / Length: 31m
    2022

    Dongjiang Water P4 Pipeline Installation at Sheung Shui, Fanling & Lo Wu

    Client: WSD (Contract No: 5/WSD/19)
    MethodSegmental Hand Shield Tunnelling
    SpecificationsDongjiang Strategic Water Network
    2020

    Kwun Tong Sewerage and Drainage Pipeline Installation Works

    Client: Drainage Services Department (DSD)
    MethodSegmental Pipe Jacking & Hand Shield
    Specifications2.5m / 2m Sleeve (700mm Liner)
    2018 - 2019

    Kam Tin Ko Po San Tsuen Pipeline Laying Project

    Main Contractor: Build King Holdings Limited
    MethodSegmental Pipe Jacking Method
    Specifications1.2m Sleeve (600mm PE Liner)
    2015

    Water Tunneling Works at Waterloo Road & Cornwall Street

    Client: Water Supplies Department (WSD)
    MethodRock TBM Tunnelling Method
    Specifications1650mm Sleeve (Hard Rock)
    2014 - 2015

    Tuen Mun Lung Mun Road Mega Drainage Pipeline Project

    Client: Drainage Services Department (DSD)
    MethodTBM Mechanical Microtunnelling
    Specifications3m Mega Sleeve / Total: 1 km
    2013

    Catchick Street Water Tunnelling Project, West Point (Sai Wan)

    Client: Water Supplies Department (WSD)
    MethodHard Rock TBM Microtunnelling
    Specifications1650mm Dia. / Rock Boring: 80m
    2013

    Ting Kok Road & Tai Po Industrial Estate Infrastructure Pipeline Works

    Project: Tai Po Industrial Estate Extension Layout
    MethodTBM Concrete Pipe Jacking
    Specifications1650mm Dia. / Boring: 80m
    2000

    Core Utility Pipeline Network from Arsenal Street to Tonnochy Road

    Project: Early Milestone Project in Urban Wan Chai, HK Island
    MethodTBM Tunnel Boring Method
    Specifications1200mm Dia. / 7 Connections